
What's included
- Excavation to proper depth
- Compacted granular footing below frost line
- Perforated weeping tile at the base of the wall
- Free-draining clear crush backfill
- Filter fabric to keep soil out of the drain
- Weep holes and daylight outlets
- Surface grading to shed water away from the wall
When you need drainage & footings
Building a new wall
Drainage and footing are part of every wall we build, never skipped.
A wall that's holding water
If your wall weeps, stains, or pushes after rain, the drainage failed or was never there.
Wet, clay-heavy ground
Langley's clay holds water. On these lots, drainage is everything.
Our process
- 1
Read the water
We figure out where water comes from and where it needs to go.
- 2
Dig and base
Excavate to depth and compact a proper granular footing.
- 3
Drain system
Weeping tile, clear crush, and filter fabric go in behind the wall.
- 4
Daylight it
We run the drain to a proper outlet so water actually leaves.
Why choose Langley Retaining Walls for this
- The part most crews skimp on, done properly
- Built for Langley's wet, clay-heavy soil
- Retrofit drainage on failing walls
- The reason our walls outlast the cheap ones
Where we build
We build drainage & footings across Langley and the Fraser Valley.
See all areas we serve